- Position:
- Chief engineer
- Service date:
- July 20, 2025
Transport towing vessels, without restrictions on the navigation area. Designed for oilfield operations. The project features the possibility of collecting petroleum products from the sea surface, extinguishing fires, transporting goods, including liquid ones, setting anchors, and of course towing. Really multipurpose. Powerful engines plus ice class. A total of 10 fleet units were built.
Project developer: Rawls Royce Marin, Novegia.
Construction site: Vard Langsten (Norway), Tangen Verft, Ulstein Verft, Halifax Shipyard (Canada), Hellesoy Skibsbyggeri (Lofallstrand), Amur Shipbuilding Plant